Permit / Authorisation
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Total timeframe to get authorisation
Official/Stated in days
Actual in days
Critical Path in days

Environmental Authorisation

Application Accomodation Is your application an accomodation of generation and transmission.

Generation infrastructure Is your application an accommodation for generation only

Transmission or distribution Select yes if your application is for transmission or no if it is for distribution.

Generation infrastructure Is the project located within a renewable energy development zone (REDZ)?

Transmission infrastructure Is project transmission infrastructure (regardless of capacity) sited within a strategic transmission corridor (STC)?

Generation infrastructure Is the electricity output from the proposed development 20 megawatts or more, excluding where such development of facilities or infrastructure is for photovoltaic installations and occurs within an urban area?

SIP Is the project a Strategic Integrated Project (SIP)?

See this link for information on REDZ and STCs. Consult the DFFE screening tool assess environmental sensitivities. See the DFFE screening tool for more information.

Information on SIPS can be found here

SANRAL

SANRAL Is road access or a enchrochment permit required?

Water Use Licence

National Water Act Does project trigger any of the following clauses in the National Water Act?

  • Section 21 (a) abstraction , particularly where borehole water is used.
  • Section 21 (c) impeding or diverting the flow of water in a watercourse.
  • Section 21 (g) disposing of waste in a manner which may detrimentally impact on a water resource.
  • Section 21 (i) altering the bed, banks, courses, or characteristics of a watercourse.

Note that water use under section 21 (c) and 21 (i) will be subjected to the risk assessment protocol contemplated in Appendix A of Gazette no. 40229, Notice no. 509, 26 August 2016. If the outcome of the risk assessment is ‘moderate’ or ‘high’ risk, then the applicant must apply for a water use licence.

SALA consent

SALA consent Is the project sited on agricultural land as defined in terms of Section 1 of the Subdivision of Agricultural Land Act (SALA)?

Developers can consult the DFFE screening tool to assess whether their project is sited on agricultural land.

DMRE Section 53 approval

DMRE Section 53 approval Are mineral or petroleum rights held in respect of land on which a renewable energy development is to take place?

Developers should consult the DMRE prior to submitting an application to understand if rights are held for the land planned for the proposal project.

SCAAA consent

SCAAA consent Is the proposed within the Sutherland Central Astronomy Advantage Area (75 km radius from South African Large Telescope (SALT)) in the Northern Cape Province?

The South African Large Telescope is located at: 32° 22 33.62 S, 20° 48 38.44 E.

KCAAA consent

For a proposed Solar PV, or battery electricity generation facility: Is it sited within 30 km of the MeerKAT or the SKA telescope?

For a proposed wind generation facility: Is it sited within 50km of the MeerKAT or the SKA telescope?

The MeerKat telescope is located at: 30° 42 47.59 S, 21° 26 35.02 E
The SKA telescope is located at: 30° 43 16.07 S, 21° 24? 40.06 E

Developers can consult the DFFE screening tool to assess whether their project is sited within the buffer zone of these instruments.

ATNS approval

=< 5000 sqm The solar PV installation is equal to or bigger than 5000 square meters.

Flight paths or radars Is it within close proximity to flight paths or radars?

The MeerKat telescope is located at: 30° 42 47.59 S, 21° 26? 35.02 E
The SKA telescope is located at: 30° 43 16.07 S, 21° 24 40.06 E

Developers can consult the DFFE screening tool to assess whether their project is sited near aerodromes/airstrips or helipads

SAWS confirmation of no objection

Weather radar Is project sited within 80km of a weather radar facility?

Weather radars are located at the following locations:

Radar Lat Lon Beam Width (degrees) Height (m)
FACTC -34.054 18.3853 1 905
FACHS -26.215 30.1878 1 1,830
FAELS -32.756 27.6616 1 603
FAPES -33.938 25.4233 1 243
FADNS -29.707 31.0815 1 137
FAUTS -31.537 28.7645 1 857
FADYC -30.665 23.9927 1.5 1,284
FABLS -29.166 26.0511 1 1,556
FABMS -28.098 28.1632 1 1,722
FAEOS -26.498 29.9841 1 1,803
FAOTS -26.735 26.0877 1 1,514
FAIRS -25.912 28.2107 1 1,532
FASZS -24.974 31.6006 2 299
FAPPS -23.894 29.5057 1 1,396
FACTX -33.955 18.6005 1 49

SAHRA permits

National Heritage Resource Act Are permits required under Section 27, 35, or 36 of the National Heritage Resource Act?

Section 27 permit – impact on national or provincial heritage site
Section 35 permit – permit to excavate archaeological/palaeontological site
Section 36 permit – permit to relocate grave

Developers can consult the DFFE screening tool to assess heritage sensitivities.

National Heritage Resource Act

Further information on permits can be found here.

Clear Form